Systems Diagrams And Visualization Project

IT Project
This project simulates the Analysis and Planning needed to provide IT services for a new building. The student
must submit a Project Schedule based on the Project Requirements and details below.
1. Using the attached MS Word table template, create a project schedule. The project schedule will need
the following columns: WBS; Task #; Task Action; Duration; Predecessor; and Resources.
2. Do not go beyond the scope identified below. The project only covers tasks identified below.
Background: IT has been notified that a new office building is ready for occupancy. All telecommunication
cables are in place. Rooms are equipped to provide access to the network once the network servers are
installed. Wireless routers are installed throughout the building to provide wireless access once the network
servers are installed. VOIP phones and vendor-supplied networked copier are already ordered.
NOTE: note specifications may contain multiple actions/tasks. Break them down into separate rows and group
similar actions into a block of tasks (i.e., Purchase Resources; Setup Equipment; etc.).
Project Specifications:
• Purchase, setup, deploy and test network servers that will be managed in the new building’s IT area.
o Setup includes loading and testing network software at corporate IT before deployment.
o Test network servers in the new building after deployment.
o NOTE: Network servers must be installed and operational before other devices can be tested
for internet and wireless connectivity.
• Purchase, setup, deploy and test Desktop PCs and Laptops in offices, labs and administrative areas.
o Setup includes loading and testing corporate software at corporate IT before deployment.
o Test all systems and ensure they can access the network once deployed.
o Test all wireless systems and ensure they can access the wireless routers.
• Purchase, deploy and test wireless Projectors.
o Test all Projectors to ensure desktops can access them via direct cabling.
o Test all Project to ensure mobile laptops can access them wirelessly.
• Purchase, deploy and test VOIP phones (they use the network to receive/generate phone calls).
o Test all phones to ensure they function properly across the network.
• Test networked Printers/Copiers once they are delivered by the lease vendor.
o Test all printers/copiers to ensure they can print documents sent across the network.
The COO has determined the following rules to facilitate occupancy:
• IT Area must be ready first. Deploy and test network servers and desktop PC three weeks before any
other location.
• Administrative Areas must be ready second. Deploy and test their desktop PCs and VOIP phones one
week before remaining locations.
• Conference & Meeting Rooms must be ready third. Deploy and test their desktop PCs, VOIP
phones and wireless projectors five days before the remaining locations.
• Offices and labs are last. Deploy and test their desktop PCs, VOIP phones and wireless projectors
before occupancy.
Project Details: The new building includes the IT Area, Computer Labs, Administrative Areas, Individual
Offices, a Conference Room, and a Public Meeting Room.
IT Area: resources include
• 4 network servers
• 1 desktop PC
• 2 laptops
• 2 VOIP phones
Administrative Areas: 2 administrative areas will each have
• 4 workstations, each with a desktop PC, networked via a network port
• a VOIP phone for each of the 4 workstations
• a vendor-supplied networked copier
Conference Room. The conference room has
• a wireless ceiling-mounted Projector
• network connectivity via a network cable and a wireless access point
• a VOIP phone
Meeting Room. The meeting room has
• a wireless ceiling-mounted Projector
• 1 desktop PC with network connectivity via a network cable.
• 2 VOIP phones (one near the lectern and the other wall mounted at the entrance
Individual Offices: 40 offices will each have
• a desktop PC networked via a network port
• a VOIP phone
Computer Labs: 2 computer labs will each have
• a wireless ceiling-mounted Projector
• a desktop PC, networked via a network port, and directly cabled to the Projector
• 25 desktop PCs networked via a network port
• a VOIP phone
• a vendor-supplied networked copier
Personnel Assignments
PC Specialist (equipment purchase, software setup and PC support):
o purchase, setup and installation of new laptops and desktop computers and corporate software
o purchase of all projectors
o work with Network Specialist to ensure network access is available on all computers and
networked printers
Network Specialist (Telecomm support):
o setup and installation of network servers and all VOIP phones
o work with PC Specialist to ensure network access is available on all computers and networked
printers
AV Specialist (A/V requirements):
o Installation of all wireless projectors
o work with PC Specialist to ensure projectors can be accessed by appropriate computers
Take time to think about how the work of the Specialists will be conducted.
• Understand how the occupancy rules affect the schedule timeline.
o Since some locations are occupied at different times, handle the deployment and testing of
resources for each location separately (i.e. IT Area separate from Admin Area; Conference Room,
Meeting Room, etc.).
• Make sure you satisfy all project specifications.
• The PC Specialist, Network Specialist and AV Specialist can be completing tasks concurrently and it is quite
possible that one specialist will have to wait while another specialist completes a task.
• The schedule must include a milestone for each block of tasks (Purchase Resources, Setup Equipment,
Deploy and Test).
o Each resource (network servers, computers, projectors) must be purchased separately since
they will come from different vendors. The VOIP phones and third-party network printers are
already ordered and just need to be tested once they arrive.
o Note: a single task may be used for a resource that is tested at a specific time (i.e. the testing of
all computers for administrative areas can be a single task; or the testing of all computer for the
2 computer labs can be a single task). However, a single task cannot be used when an action
must be done during different occupancy periods (i.e., testing of IT Area resources is a separate
task from testing of Administrative Areas, etc. since they take occupancy at different times.)
• Task Actions must start with a verb and describe the action (i.e., Test VOIP phones)
o Milestones do not start with verbs and have a zero duration.
• When creating the schedule, use your best guess in determining Duration. Use a single measure (i.e.,
min.) for all tasks.
• Resources must include both the people (title of the IT Specialist) and specific resource(s).
• When creating Predecessors, point to the respective Task # (not the WBS number). It is not necessary
to include a task that is already a predecessor of another task (i.e. consider the following tasks: 1:
Order food, 2: Eat food, 3: Cleanup. The predecessor for 2 is 1. The predecessor for 3 is 2 (i.e. 2
already has a predecessor of 1).
o Note: be careful about predecessors. Not only are they directly related to the tasks that
proceed them within a Milestone but they may be directly related to tasks within other
Milestones (example: network servers must be operational before other equipment can be
tested for network connectivity – look for other dependencies described above).
• The WBS should be completed once the schedule is in its final version.

—-

IT Initiative
This project simulates the analysis and planning required to deliver information technology services for a new building. The pupil

must provide a Project Schedule based on the Project Requirements and specifications listed below

1. Create a project schedule using the attached MS Word table template. The project timetable will necessitate

WBS; Task #; Task Action; Duration; Predecessor; and Resources are the columns.

2. Do not deviate from the scope outlined here. The project only addresses the tasks listed below.

The IT department has been advised that a new office facility is ready for occupancy. Telecommunications in general

The cables have been installed. Once the network servers are operational, the rooms are outfitted to enable network access.

installed. Wireless routers are installed throughout the building to provide wireless access once the

Instant Nursing Papers
Hire a Nursing Expert
Pages (550 words)
Approximate price: -

Why Choose Instant Nursing Papers?

Quality Nursing Papers

We assist students in achieving the best top-grade in their nursing papers, and in compliance with the provided instructions. Have your nursing paper written with a certified specialist Ph.D., Bachelor's, and Master's graduates with many years of experience in academic writing.

Experts with Ph.d., MDs and DNP Holders

Our writers have acquired Ph.D., MDs and DNP credentials from world class institutions. Our writers can handle papers from any discipline and can handle over 100+ subjects.

Nursing Papers Cheap

We provide a great deal of student-friendly prices and professionalism with all our nursing essay writing services. Our paper writing services have a user-friendly interface and professional nursing academic assistance. We are committed to assisting all students with their nursing assignments and projects regardless of their academic level.

Fast Paper Delivery

Our writers follow a strict schedule to ensure papers are delivered before the deadline to enable our editors to proofread before the final delivery to our customers. We strictly observe the early delivery of assignments to meet our clients' deadlines.

Plagiarism-free Nursing Papers

Our expert nursing paper writers are dedicated to conducting thorough research and writing papers from scratch to deliver original papers. To avoid paper plagiarism, all orders go through steps of writing, editing, and proofreading.

24Hour Customer Help

Our customer support is available 24/7/365 to help clients and make their paper writing services easy to use. Our experienced support team is available to answer your queries any time, 24 hours a day.

Try it now!

Calculate the price of your order

We'll send you the first draft for approval by at
Total price:
$0.00

How it works?

Follow these simple steps to get your paper done

Place your order

Fill in the order form and provide all details of your assignment.

Proceed with the payment

Choose the payment system that suits you most.

Receive the final file

Once your paper is ready, we will email it to you.

Our Nursing Papers Writing Service

We provide Nursing Assignment Services to Nursing students. Also, we are not limited to providing Nursing assignment help to students only. We also provide assignment help and solutions to community health nursing, Anatomy & Physiology, Microbiology, Biochemistry and Biophysics, and Nutrition & Dietetics.

Essays

Nursing Essays

Sit back, relax while our writers sort you out on your most daunting nursing essay queries on how to write a good nursing essay. We got you if you are looking for the best nursing essay services.

Research

Nursing Projects

It is no doubt that qualifying for a nursing career is difficult and requires a series of tests. Most nursing students must put in a lot of work in their assignments and coursework. Instantnursingpapers.com will help you answer queries such as “who can write my nursing research paper?”.

Disserations

Nursing Dissertation Help

Instantnursingpapers.com will save you the hustle of undergoing pressure or even depression while doing your nursing dissertation paper. Save yourself from all the long sleepless nights and pressure by working with our best nursing dissertation writing professionals.

Coursework

Nursing Coursework Help

If you happen to hop into our site in search of nursing coursework help, look no further. We are the number one solution for the best nursing coursework assignments. Therefore, to complete the best APA nursing coursework, seek help from professional nursing coursework experts at instantnursingpapers.com